RokStok

Does anyone have an actual weight on the trimmed pachmyer vs a spacer with the stock pad vs the trim to fit limb saver? I want a longer LOP but not sure how I want to get there yet. I already have the trim to fit limb saver but the thing is like 5oz that I don’t really want to add.
 
Does anyone have an actual weight on the trimmed pachmyer vs a spacer with the stock pad vs the trim to fit limb saver? I want a longer LOP but not sure how I want to get there yet. I already have the trim to fit limb saver but the thing is like 5oz that I don’t really want to add.

The stock pad, spacers, and screws for 1" thickness was 3.8 ounces and the small Pachmayr before grinding was barely lighter, I think it was 3.6
 
I talked to UM yesterday. They had some QC issues with a batch from Stockys and had to send a bunch back. I'd imagine this is probably effecting lead times for a lot of orders (including mine).

As always UM was super helpful on the phone.
 
I don’t get why they are still going through Stockys for the lites. These would have sold 10x with any other stock maker capable of high yield production…
 
I don’t get why they are still going through Stockys for the lites. These would have sold 10x with any other stock maker capable of high yield production…

But probably would have put the price in line with everything else. 999 for a stock, 999 for an action, 999 for a scope, 999 for a can.


Sent from my iPhone using Tapatalk
 
Order placed 93 days ago, received email few mins ago that it's "in production" at stockys. So it'll be 4 months overall likely. Not terrible, but all my McMillans have been under 3 months in last year and a half. Manners? Lol you could plan/execute a moon landing quicker than their typical lead times.
 
Order placed 93 days ago, received email few mins ago that it's "in production" at stockys. So it'll be 4 months overall likely. Not terrible, but all my McMillans have been under 3 months in last year and a half. Manners? Lol you could plan/execute a moon landing quicker than their typical lead times.
Received my notice as well.
 
Back
Top