Im not sure if im just naive to the plumbing industry or if im getting screwed by a plumber I just hired. I hired a plumber to hook up 3 new vanities in a house im remodeling. I probably could have done this myself but time is running out and there were some unusual things I wanted a professional to handle ( replaced a single sink vanity with double sink, and a couple other things).
Anyway, the total bill ended up being $1800. $1000 in labor, and nearly $800 in materials. I went in the house to check the work and 3 lights were left on, piss was left in the toilet along with a dip. mud and dirt all over my brand new floors... All that aside my invoice only read "materials" with none of the parts listed out. I asked the plumber for an itemized list of parts or receipts and he replied they dont do that and that parts are marked up.
Am I out of line for asking for at least an itemized list or receipts or is that just how the plumbing business operates? Overall I was not expecting what I thought would be a relatively simple job to cost so much.
Anyway, the total bill ended up being $1800. $1000 in labor, and nearly $800 in materials. I went in the house to check the work and 3 lights were left on, piss was left in the toilet along with a dip. mud and dirt all over my brand new floors... All that aside my invoice only read "materials" with none of the parts listed out. I asked the plumber for an itemized list of parts or receipts and he replied they dont do that and that parts are marked up.
Am I out of line for asking for at least an itemized list or receipts or is that just how the plumbing business operates? Overall I was not expecting what I thought would be a relatively simple job to cost so much.