When they cut the driveway in matters a bit as well
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Lets for fun say you were going to pave it. 600x10 with 4" of aspahlt is right around 146 tons and i only know prices around here and its roughly 130-160 per ton in place and thats with no grade work. So it would be some where in the 20 k range to have it paved. If you were to go concrete which i think is better way less up keep than asphalt your looking at 74 yards at 4" right around 40k in place also with no grade work. Going through those numbers makes that 44k for just grading and rock seem a little high.From what I can tell from the pictures, I would guess you will want to switchback that driveway. If that's the case, I would run two culverts. I would probably skip the geogrid, but I am from the Inland Northwest. If the subgrade is poor here, we will CTB it. 6" of 1 1/4" agg should hold up pretty good, I like it better than 5/8" for driveways.
Prices vary so much by area, but if I was paying 45k for a driveway, I would hope to be getting it paved.
I meant with no grade work that would be an added expense i was not figuring. Asphalt and concrete are only as good as the base they are placed on.You absolutely need "grade work" with asphalt or concrete.
I recommend that you consult a local geotechnical engineer that is licensed in OH. Ask for a gravel road section design with borrow ditches. This will include instruction for subbase and agg base thickness, subgrade compaction, cross slope, etc. The geotech will also be knowledgeable on the drainage. Ideally, the borrow ditch will infiltrate, but if the native soils do not percolate, you'll have to find some way for the borrow ditches to discharge to the historical drainage paths.
A competent contractor can use this design to build a road along the alignment you choose.
Our typical driveway section is 3" over 4". Pickup up mix $68-72 per ton. In place $20-24 per SY. I calc'd 300x12', 154pcf, .93 compaction, 65T of HMA.Lets for fun say you were going to pave it. 600x10 with 4" of aspahlt is right around 146 tons and i only know prices around here and its roughly 130-160 per ton in place and thats with no grade work. So it would be some where in the 20 k range to have it paved. If you were to go concrete which i think is better way less up keep than asphalt your looking at 74 yards at 4" right around 40k in place also with no grade work. Going through those numbers makes that 44k for just grading and rock seem a little high.
In the less harsh climates i could see 3" working. Might get away with it here if you used some higher polymer mixes but they are a pain in the ass and add cost. Its 95.00 to pick asphalt up at here at the plant but we dont sell to fly by nighters to keep them out of the country.Our typical driveway section is 3" over 4". Pickup up mix $68-72 per ton. In place $20-24 per SY. I calc'd 300x12', 154pcf, .93 compaction, 65T of HMA.
I agree, Concrete>Asphalt for driveways 100%.
It's a ridgetop...probably can't get shovel half way in the ground without hitting rock.I can't find a rock in any of your pics
For sure. I imagine its different where you sre located. But our nearest quarry carries a 2-4in and a 3-5in. For a driveway with just cars and pickups we use the 2-4in and if trucks will be on it we use 3-5inIf I was paying $45k for a driveway, they sure as hell better not be putting down 1-1/4" rock as a base
Topo map is worth 100 picturesAbsolutely no way to give worthwhile advice without seeing the project.
Or LOTS of pictures…