Last year we were going to do a 1,600 sf barndo. Did the preliminary estimates and come out with about $50-$60k to get the slab and shell up. Would piece meal it from there. Got the guys together on-site regarding site prep and the installation jumped to over $100k just cause.
Decided to back off and guy says no refund on deposit. So we have a 14x36 steel bld onsite right now - just got it foam insulated. Be a decent camp but still need to do a house for future. We'll do the site prep and will already have septic, etc. by time we build.
The electrician has already exceeded his estimate by a bit. Getting folks to show up is the trick. Took 7 months to get the electrician onsite. Foam insulation guy stood us up and never contacted us. Next foam guy was there in a couple days. Electrician is the plumber.
What it comes down to is that they can't get decent help and those that are decent help start their own businesses.
Decided to back off and guy says no refund on deposit. So we have a 14x36 steel bld onsite right now - just got it foam insulated. Be a decent camp but still need to do a house for future. We'll do the site prep and will already have septic, etc. by time we build.
The electrician has already exceeded his estimate by a bit. Getting folks to show up is the trick. Took 7 months to get the electrician onsite. Foam insulation guy stood us up and never contacted us. Next foam guy was there in a couple days. Electrician is the plumber.
What it comes down to is that they can't get decent help and those that are decent help start their own businesses.