I'll start with the SC.
I cut 9" pieces from a stalk of 6061 t6 aluminum that was 3/4" x 3/16".
I used the existing loadlifter straps and that got me from 21" to 24". If you needed more lift you would just add some webbing and a ladderlocks to the extension.
I cut through the bag right above where the existing frame sheath top ended.
I drilled holes as you will see in pics. Top about 1/2" down and then lined up the stays where I wanted them and drilled holes through both for a screw that would hold the two pieces together. I used a soldering iron to cut through bag and to punch holes in webbing.
Five pics per post will continue.
I cut 9" pieces from a stalk of 6061 t6 aluminum that was 3/4" x 3/16".
I used the existing loadlifter straps and that got me from 21" to 24". If you needed more lift you would just add some webbing and a ladderlocks to the extension.
I cut through the bag right above where the existing frame sheath top ended.
I drilled holes as you will see in pics. Top about 1/2" down and then lined up the stays where I wanted them and drilled holes through both for a screw that would hold the two pieces together. I used a soldering iron to cut through bag and to punch holes in webbing.
Five pics per post will continue.