Ive got this euro im hanging over an electric fireplace insert but was an old chimney. Not exactly sure if theres drywall behind the veneer before it touches masonry behind. Just curious what hardware to use and how deep into the wall the masonry starts? New house to us and unsure of build plans. Was thinking of just drilling a small inconspicuous pilot hole thru veneer to see but checking if anyone has experience with this setup?