I am in the preliminary stages of a custom build. I want to put a Proof Research carbon barrel on my Browning X-Bolt Stainless 300 H&H action and also put a Pendleton composite stock on it. I have talked to two different gunsmiths and here are my options.
Option 1: Proof Barrel--$800 plus $250 to machine, chamber and crown.
Blue Print action, bolt and lap lugs--$250.
Pendleton Stock--$650 installed.
Muzzle Brake--$150.
Cerakote Barreled Action--$185 (I don't know if this is necessary with a stainless steel action)
Total--$2285 ($2100 without the Cerakote) and only 100 miles away from my house.
Option 2: Proof Barrel--$900 (All barrel work is included in that price. $300 to do barrel work if I supply barrel.)
This gunsmith claims that my Browning Action does not need trued. He loves this action and likes it almost as much
as a Sako action.
Pendleton Stock--$650 installed.
Muzzle Brake--$200.
No Cerakote.
Total--$1750 and 1000 miles away from my house.
I guess the two biggest differences are (1.) the costs to do the barrel work and (2.) one guy wants to machine the action and the other guy doesn't. I like that the one guy is right up the road, but he is $350 more. What do you guys think of the two different estimates? Thanks.
Option 1: Proof Barrel--$800 plus $250 to machine, chamber and crown.
Blue Print action, bolt and lap lugs--$250.
Pendleton Stock--$650 installed.
Muzzle Brake--$150.
Cerakote Barreled Action--$185 (I don't know if this is necessary with a stainless steel action)
Total--$2285 ($2100 without the Cerakote) and only 100 miles away from my house.
Option 2: Proof Barrel--$900 (All barrel work is included in that price. $300 to do barrel work if I supply barrel.)
This gunsmith claims that my Browning Action does not need trued. He loves this action and likes it almost as much
as a Sako action.
Pendleton Stock--$650 installed.
Muzzle Brake--$200.
No Cerakote.
Total--$1750 and 1000 miles away from my house.
I guess the two biggest differences are (1.) the costs to do the barrel work and (2.) one guy wants to machine the action and the other guy doesn't. I like that the one guy is right up the road, but he is $350 more. What do you guys think of the two different estimates? Thanks.