Construction 101: Change Orders

JBF92

FNG
Joined
Mar 31, 2021
Messages
11
This is a tough one, been on both sides of the coin. As an electrical contractor we try to be as clear as we can with what we include. I run into a lot of items that are not up to code and "could/ should" be fixed or I could turn a blind eye and look the other way. I try to be as detailed as can be when dealing with existing buildings. When it comes to new construction, it should be all inclusive and fairly straight forward.
 

qwerksc

WKR
Joined
Jan 11, 2017
Messages
533
Location
California
As a Contractor, I’d rather do the carpentry side of the work, carpenter will save you money, contractor will spend it.
 